
ANSI/IEEE C57 Market
Power Infrastructure
in United States.
ETS supplies UL-listed pad-mounted, ANSI/IEEE-compliant power transformers and ANSI-rated switchgear across all 50 states. North American sales operations are based in Gaithersburg, MD with focus on data-centre, renewable PV and utility infrastructure procurement.
Market context
Grid topology, regulation & demand drivers.
The US transformer market is the largest globally, structured around three RTO/ISO regions — PJM (mid-Atlantic), MISO (midwest) and ERCOT (Texas) — plus the Western Interconnection's CAISO and the Eastern Interconnection's NYISO and ISO-NE. Procurement runs through three distinct utility models: investor-owned utilities (IOUs) like Duke Energy, Southern Company and Dominion; municipal and public power agencies; and ~900 rural electric cooperatives. Pad-mounted distribution transformers (200 kVA–5 MVA) and substation power transformers (10–500 MVA) follow ANSI/IEEE C57 standards, UL 506 listings and DOE 10 CFR 431 efficiency mandates (Tier 2 effective 2027). Voltage levels are 12.47/13.8/24.94/34.5 kV at MV and 69/115/138/230/345/500/765 kV at transmission. Demand is driven by an unprecedented data-centre buildout in Northern Virginia (PJM Dominion zone), Texas (ERCOT), Phoenix and Atlanta — projected to add 100 GW+ of load by 2030 — plus IRA-funded utility-scale solar and storage in California, Texas and the Southeast. Permitting bottlenecks and 2–3 year lead times for power transformers from incumbent OEMs have created severe procurement pressure. ETS sales operate from Gaithersburg, MD with UL-listed pad-mounted units shipped from Jebel Ali via East-Coast container ports in 25–30 days, addressing the supply gap with 16-week lead times for 100–5000 kVA pad-mounted fleet orders.
Cities & metropolitan areas
Where we deliver in United States.
Houston
CenterPoint Energy
Dallas
Oncor
San Antonio
CPS Energy
Austin
Austin Energy
Midland
Oncor
Los Angeles
LADWP · SCE
San Francisco
PG&E
San Diego
SDG&E
Sacramento
SMUD
New York
Con Edison
Newark
PSE&G
Philadelphia
PECO
Pittsburgh
Duquesne Light
Chicago
ComEd
Detroit
DTE Energy
Indianapolis
AES Indiana
Columbus
AEP Ohio
Atlanta
Georgia Power
Charlotte
Duke Energy
Nashville
NES
Raleigh
Duke Energy
Jacksonville
JEA
Miami
FPL
Tampa
TECO
Orlando
OUC · Duke Energy
Phoenix
APS · SRP
Denver
Xcel Energy
Las Vegas
NV Energy
Salt Lake City
Rocky Mountain Power
Seattle
Seattle City Light
Portland
PGE
Boston
Eversource · National Grid
Baltimore
BGE
Washington D.C.
Pepco
Minneapolis
Xcel Energy
St. Louis
Ameren Missouri
Kansas City
Evergy
New Orleans
Entergy
Regional standards
Utility partners
Flagship projects
Reference deliveries in United States.
Texas data-centre campus pad-mounted fleet
Virginia hyperscale substations
California utility distribution upgrades
Product catalogue
Recommended products for United States.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Operating elsewhere?
See our markets in other regions.
Frequently Asked Questions — United States
For projects in United States, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA), 22–28 weeks for power transformers (33–132 kV, up to 60 MVA) and 32–44 weeks for EHV units above 132 kV. All bands include witnessed Factory Acceptance Testing at our Jebel Ali high-voltage lab and ex-works delivery. Across the 38 cities we serve in United States, express slots are available for repeat utility customers — confirm at quote stage.
Sourcing for United States?
Get a regionally compliant quote with witnessed FAT, full traceability and on-site commissioning.



