
Generator Step-Up (GSU) Transformers
Generator step-up transformers purpose-built for power plants — connecting generators to the transmission grid at elevated voltage. Optimised for continuous full-load operation with low losses, high reliability, and enhanced short-circuit withstand.
Engineering Features
Continuous Full-Load Rated
Designed for 100% continuous duty at nameplate rating — no derating required for base-load generator operation.
Technical Data
| Parameter | Range / Value |
|---|---|
| Rated Power | 10 – 200 MVA |
| Voltage Ratio | Up to 132 kV / 6.6–22 kV |
| Frequency | 50 / 60 Hz |
| Vector Group | YNd1 / YNd11 |
| Impedance | 12% – 18% |
| Cooling | ONAN / ONAF / OFAF |
| Tap Changer | OLTC ±10% / 17 steps |
| Temperature Rise | Top oil ≤ 55K, Winding ≤ 60K |
| Standards | IEC 60076 / IEEE C57.116 |
| Design Life | 40+ years |
Standard range parameters — custom specifications available on request.
Related glossary terms
DEWA Approved
Dubai Electricity & Water Authority vendor
ADDC / AADC
Abu Dhabi Distribution Company approved
SEWA / FEWA
Sharjah & Federal Electricity authorities
ADNOC AVL
ADNOC Approved Vendor List
IEC 60076
International standard for power transformers
ARAMCO 17-SAMSS
Saudi ARAMCO material specification
Generator step-up transformers for GCC thermal, nuclear and renewable power plants. 10 MVA to 500 MVA up to 765 kV per IEC 60076 — KEMA short-circuit certified and engineered for the region's 50 °C+ ambient. Supplied to DEWA, ADWEC, SEC, KAHRAMAA, the Barakah nuclear plant and renewable IPPs at the Mohammed bin Rashid Al Maktoum Solar Park, Sakaka, Sudair and NEOM.
Barakah Nuclear Plant 4×1400 MW GSU · UAE
DEWA Hassyan & Jebel Ali CCGT GSU
ADWEC Taweelah & Mirfa Power Plants
MBR Solar Park 5GW GSU · Dubai
Saudi PIF Renewable IPP GSU · Sakaka, Sudair
NEOM Renewable Hub GSU · Saudi NW
Where Generator Step-Up (GSU) Transformers Excel.
Barakah Nuclear Plant 4×1400 MW GSU
Generator step-up transformers for the Barakah Nuclear Plant 4×1400 MW units — IEC 60076 with KEMA short-circuit certification.
DEWA Hassyan & Jebel Ali CCGT GSU
Generator step-up transformers for DEWA Hassyan and Jebel Ali combined-cycle power-plant generation step-up.
MBR Solar Park 5 GW GSU
Renewable IPP step-up transformers for the Mohammed bin Rashid Al Maktoum Solar Park 5 GW gigascale build-out.
Saudi PIF Renewable IPP GSU
GSU transformers for Saudi PIF-backed renewable IPPs at Sakaka, Sudair and NEOM renewable hubs.
Frequently Asked Questions
Deployed in
Related Knowledge
FAQs, glossary terms and sizing steps mapped to this product.

Ready to Specify Generator Step-Up Transformers?
Share your technical requirements and our engineering team will provide a detailed proposal with guaranteed performance parameters.


