Containerized Substation
Plug & play containerized systems, custom skid and container fabrication, and complete mechanical & electrical integration. Factory-assembled and tested for rapid deployment.
Engineering Features
Plug & Play Containerized Systems
Complete, self-contained power solutions in standard or custom containers — delivered ready to connect.
Technical Data
| Parameter | Range / Value |
|---|---|
| Rated Power | 500 kVA – 5 MVA |
| MV Voltage | 11 – 36 kV |
| LV Voltage | 230/400 V – 690 V |
| Frequency | 50 / 60 Hz |
| MV Switchgear | RMU / VCB Panel |
| LV Panel | ACB / MCCB Distribution |
| Enclosure | Galvanized Steel / SS |
| Protection Class | IP54 / IP64 / IP65 |
| Dimensions | Custom per configuration |
| Weight | From 2,500 kg |
Standard range parameters — custom specifications available on request.
Related glossary terms
DEWA Approved
Dubai Electricity & Water Authority vendor
ADDC / AADC
Abu Dhabi Distribution Company approved
SEWA / FEWA
Sharjah & Federal Electricity authorities
ADNOC AVL
ADNOC Approved Vendor List
IEC 60076
International standard for power transformers
ARAMCO 17-SAMSS
Saudi ARAMCO material specification
DEWA, ADDC, SEWA, FEWA, KAHRAMAA and SEC approved turnkey package substations for the GCC. 500 kVA to 5 MVA at 11 kV / 22 kV / 33 kV per IEC 62271-202, factory-assembled in Jebel Ali with distribution transformer, ring main unit, LV switchboard and weatherproof enclosure rated for 50 °C+ ambient and saline-coastal service. Standard for utility, oil & gas, construction and mega-project deployment across the UAE and Saudi Arabia.
DEWA Secondary Substations · Dubai Emirate
ADDC Distribution Substations · Abu Dhabi
Saudi Vision-2030 Mega-Projects · NEOM, Diriyah, Qiddiya
ADNOC Field & Plant Distribution
GCC Construction Site Power · Mega-Project Phasing
Saudi Aramco Pipeline & Pump Stations
Where Containerized Substation Excel.
DEWA & ADDC Substations
DEWA and ADDC approved containerised package substations for utility secondary substation deployment.
ADNOC & ARAMCO Process Sites
Hazardous-area package substations for ADNOC and Saudi Aramco process plants, gas terminals and remote sites.
Vision 2030 Mega-Projects
Pre-engineered substations for NEOM, The Red Sea Project, Lusail and other Vision 2030 mega-developments.
GCC Mining & Construction
Skid-mounted substations for GCC mining, construction-site power and temporary urban development feeds.
Frequently Asked Questions
Related Knowledge
FAQs, glossary terms and sizing steps mapped to this product.

Ready to Specify Containerized Substation?
Share your technical requirements and our engineering team will provide a detailed proposal with guaranteed performance parameters.