Jordan
Transformers & Switchgear
in Aqaba.
ETS delivers IEC 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Aqaba. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Aqaba is Jordan's only seaport and a Special Economic Zone (ASEZA) with its own utility licence under EDCO/IDECO frameworks, plus dedicated bulk supply from the Aqaba Thermal Power Plant (650 MW) and the proposed Aqaba-Amman 400 kV transmission upgrade. Voltage families: 11/33 kV at MV and 132 kV at transmission. The Red Sea coastal salt-fog, 45 °C summer ambient and the cruise/container port load drive a tropicalised IEC 60076 spec with C5-M paint and copper windings. Tender drivers: the Aqaba Container Terminal expansion, the Aqaba-Eilat-Akko hydrogen export pipeline study and the proposed Saudi-Jordan 3 GW HVDC interconnector landing.
Utility partners in Aqaba
Other markets in Jordan
Nearby cities we serve.
Product catalogue
Recommended products for Aqaba.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Aqaba
For projects in Aqaba, ETS quotes 8–14 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 16–22 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to EDCO specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Aqaba?
Regionally compliant transformers and switchgear delivered to Aqaba with witnessed FAT and on-site commissioning.