Pakistan
Transformers & Switchgear
in Lahore.
ETS delivers IEC 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Lahore. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Lahore is Pakistan's second-largest city, supplied by LESCO (Lahore Electric Supply Company) at 11/33 kV MV with NTDC operating the 132/220/500 kV transmission ring. Bulk supply: the Bhikki and Haveli Bahadur Shah RLNG CCGTs (1,180 MW each), plus the China-Pakistan Economic Corridor (CPEC) Sahiwal coal (1,320 MW) and Karot Hydropower (720 MW). Specifications follow PSQCA-marked IEC 60076 with 45 °C tropicalised design, copper windings and the GCC-equivalent NEPRA grid code. Tender drivers: Lahore Orange Line Metro expansion, the Allama Iqbal International Airport rebuild, the Ravi Riverfront Urban Development Authority and the Lahore Ring Road CPEC industrial estates.
Utility partners in Lahore
Other markets in Pakistan
Nearby cities we serve.
Product catalogue
Recommended products for Lahore.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Lahore
For projects in Lahore, ETS quotes 8–14 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 16–22 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to LESCO specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Lahore?
Regionally compliant transformers and switchgear delivered to Lahore with witnessed FAT and on-site commissioning.


