Iraq
Transformers & Switchgear
in Erbil.
ETS delivers IEC 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Erbil. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Erbil is the capital of the Kurdistan Region of Iraq (KRI) and operates a semi-autonomous grid licensed by the KRG Ministry of Electricity, distinct from the federal Iraqi MoE. The grid runs 11/33 kV at MV with 132/400 kV transmission, fed by the Erbil-North CCGT (1.5 GW), Bazian (500 MW) and the Iran-KRI 400 kV import link. Specifications follow IEC 60076 with 50 °C tropicalised design, copper windings and explosion-proof switchgear for the Khurmala/Tawke oilfield zones. Demand drivers: the Erbil International Airport expansion, the proposed Erbil Metro, the upstream IOC consortia (DNO, Genel, Gulf Keystone) and the proposed KRI-Turkey 400 kV interconnector via Şırnak.
Utility partners in Erbil
Other markets in Iraq
Nearby cities we serve.
Product catalogue
Recommended products for Erbil.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Erbil
For projects in Erbil, ETS quotes 8–14 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 16–22 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to KRG Electricity specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Erbil?
Regionally compliant transformers and switchgear delivered to Erbil with witnessed FAT and on-site commissioning.