    India's grid is operated by POWERGRID with state-owned DISCOMs handling distribution. ETS supplies IEC and IS-1180-compliant distribution and power units for export markets including Mumbai, Delhi and Chennai industrial expansion.

    3
    Cities Served
    4
    Standards
    2
    Utilities
    Active
    Years Active

    Market context

    Grid topology, regulation & demand drivers.

    India's transmission backbone is operated by Power Grid Corporation of India Limited (POWERGRID), with state-owned distribution companies (DISCOMs) and a small number of private licensees — Tata Power, Adani Electricity (Mumbai), BSES and Tata Power Delhi (NCT) — handling distribution. The Central Electricity Authority (CEA) governs technical regulations and the National Electricity Plan sets capacity-addition targets. Voltage levels are 11/22/33 kV at MV and 132/220/400/765 kV at transmission, with extensive 800 kV HVDC corridors enabling renewable evacuation from Rajasthan and Gujarat solar parks. Indian standards (IS 1180 for distribution, IS 2026 for power transformers) layer additional efficiency, BEE star-rating and CRGO core requirements on top of IEC 60076. The country has set 500 GW of non-fossil capacity by 2030, anchored by the Bhadla, Pavagada, Khavda and Rewa solar parks plus offshore wind in Gujarat — driving multi-GW step-up transformer demand. Industrial demand centres on the Delhi-Mumbai Industrial Corridor, the Chennai-Bengaluru auto belt, and Gujarat's GIFT City and PCPIR petrochemical zones. ETS supplies IS 1180 and IEC 60076-compliant units from Jebel Ali via Nhava Sheva or Mundra ports in 7–10 days.

    Cities & metropolitan areas

    Where we deliver in India.

    Regional standards

    IEC 60076IS 1180IS 2026CEA Regulations

    Utility partners

    POWERGRIDState DISCOMs

    Product catalogue

    Recommended products for India.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    Operating elsewhere?

    See our markets in other regions.

    FAQ

    Frequently Asked Questions — India

    For projects in India, ETS quotes 8–14 weeks for distribution transformers (11–33 kV, up to 5 MVA), 16–22 weeks for power transformers (33–132 kV, up to 60 MVA) and 26–34 weeks for EHV units above 132 kV. All bands include witnessed Factory Acceptance Testing at our Jebel Ali high-voltage lab and ex-works delivery. Across the 3 cities we serve in India, express slots are available for repeat utility customers — confirm at quote stage.