Power Utilities & Grid
    Fleet-Standard. Utility-Approved. Grid-Ready.

    Power Utilities & Grid

    The backbone of national power infrastructure. Our transformers are fleet-standard at 15+ utility companies — not trial units, but the units they deploy by the thousands.

    View Products

    ETS supplies IEC 60076 distribution transformers, package substations and power transformers up to 500 MVA / 400 kV to DEWA, ADDC, SEWA, FEWA and Saudi grid operators — supporting primary and secondary substation programmes across the UAE, KSA, Oman, Qatar, Kuwait and Bahrain.

    Regional Reference Projects

    DEWA Hassyan 400 kV grid transformer programme

    ADDC Abu Dhabi distribution transformer fleet

    SEWA Sharjah 132 kV primary substation supply

    FEWA Northern Emirates secondary substations

    Saudi Electricity Company 380 kV grid transformers

    OETC Oman & QatarEnergy distribution programmes

    0
    Utility Approvals
    0
    Max Rating
    0
    Voltage Class
    0
    Years Heritage
    The Challenge

    The Challenge

    National utilities demand transformers that perform flawlessly for 30+ years under extreme conditions — sandstorms, 50°C+ ambient, voltage fluctuations — with zero tolerance for failure.

    Our Solution

    Our Solution

    We don't just meet utility specifications — we helped write them. Our transformers are type-tested, KEMA-witnessed, and approved by DEWA, ADDC, KAHRAMAA, SEWA, SEC, and 10+ more.

    Why ETS

    Fleet-Standard. Utility-Approved. Grid-Ready.

    Fleet-standard at 15+ national utilities across MENA

    KEMA-witnessed short-circuit testing on every power transformer

    50°C+ ambient temperature design as standard

    Complete lifecycle support: maintenance, retrofit, monitoring

    Powering Dubai's Grid Expansion — 45 Units for DEWA
    Project Spotlight

    Powering Dubai's Grid Expansion — 45 Units for DEWA

    Dubai, UAE202445 × 2 MVA

    A fleet order of 45 hermetically sealed 33/11 kV distribution transformers deployed across Dubai's rapidly expanding network. Each unit designed for 50°C+ ambient with KEMA-witnessed type testing — delivered in 12 weeks, 100% first-pass acceptance.

    100%
    First-Pass Acceptance
    12
    Weeks to Deliver
    Zero
    Field Returns
    Engineered to Outperform

    Where We Exceed the Standard

    Our engineering team doesn't design to minimum specifications. Every parameter is pushed beyond industry norms — because your operations demand it.

    Thermal Performance

    Lower temperature rise extends insulation life by 2× and enables continuous overloading without derating — critical for Gulf ambient temperatures.

    Industry Standard55°C Rise
    ETS50°C Rise

    Short-Circuit Withstand

    KEMA-witnessed dynamic and thermal short-circuit testing exceeds IEC 60076-5 requirements, ensuring survivability in the harshest fault conditions.

    Industry Standard25 kA / 1s
    ETS31.5 kA / 3s

    No-Load Losses

    Amorphous and Hi-B laser-scribed core steel reduces no-load losses by up to 30%, delivering measurable TCO savings over the transformer's 35-year lifespan.

    Industry StandardStandard Grade CRGO
    ETSHi-B Laser-Scribed Core
    FAQ

    Frequently Asked Questions

    Need a Sector-Specific Solution?

    Our engineering team understands your industry's unique challenges. Let's design the right transformer for your application.

    View All Products