United States

    Transformers & Switchgear
    in Midland.

    04:13 GMT-5·17°C · Clear

    ETS delivers IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Midland. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    US
    Country
    12.47/69/138 kV
    Grid voltage
    Hot semi-arid (BSh)
    Climate zone
    ANSI/IEEE C57
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Midland is the operational heart of the Permian Basin — the largest oil-producing region in the United States and one of the most demanding markets in the world for upstream-rated transformers. Oncor Electric Delivery serves the city under ERCOT (Electric Reliability Council of Texas), with a 12.47/25 kV MV grid stepped down from 69/138/345 kV transmission. The Permian's surge in produced gas and crude — over 6 million barrels per day in 2024 — drives sustained procurement of pad-mounted distribution units for well pads, MV switchgear for gas-processing plants, and oil-and-gas-rated power transformers for compressor stations and gathering systems. Specifications follow IEEE C57.12.00 / C57.12.34 with API 670, NEC Class I Div 2 hazardous-area ratings and 50 °C ambient design. Tender hints: Oncor procures via ERCOT framework agreements but the largest Permian opportunity is direct-to-operator (ExxonMobil, Chevron, ConocoPhillips, Pioneer) where Aramco-grade SAES specifications often apply.

    Utility partners in Midland

    Oncor

    Other markets in United States

    Nearby cities we serve.

    Product catalogue

    Recommended products for Midland.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Midland

    For projects in Midland, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to Oncor specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.

    Operating elsewhere?

    See our markets in other regions.

    Procuring for Midland?

    Regionally compliant transformers and switchgear delivered to Midland with witnessed FAT and on-site commissioning.