United States
Transformers & Switchgear
in Austin.
ETS delivers IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Austin. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Austin is supplied by Austin Energy — the eighth-largest publicly-owned utility in the US — operating 12.47/24.9 kV at MV and 138/345 kV at transmission within ERCOT. Austin Energy's Resource Generation Plan targets 100% carbon-free electricity by 2035, driving demand for solar GSU transformers, battery-storage step-up units (4-hour BESS at Hornsby Bend), and wind-corridor 345 kV grid reactors. Specifications follow IEEE C57.12.00 with Austin Energy ES-D-1410 pad-mount and ES-D-1411 substation standards, ester-fluid mandatory for downtown vault network and stainless-steel enclosures for flood resilience. Tender drivers: the Tesla Giga Texas (Austin Bolt) expansion, the Samsung Taylor semiconductor fab adjacency, Apple Campus 2 and the Austin-Bergstrom International Airport rebuild.
Utility partners in Austin
Other markets in United States
Nearby cities we serve.
Product catalogue
Recommended products for Austin.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Austin
For projects in Austin, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to Austin Energy specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Austin?
Regionally compliant transformers and switchgear delivered to Austin with witnessed FAT and on-site commissioning.