United States

    Transformers & Switchgear
    in Austin.

    04:13 GMT-5·17°C · Clear

    ETS delivers IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Austin. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    US
    Country
    ANSI/IEEE C57
    Grid voltage
    Climate zone
    ANSI/IEEE C57
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Austin is supplied by Austin Energy — the eighth-largest publicly-owned utility in the US — operating 12.47/24.9 kV at MV and 138/345 kV at transmission within ERCOT. Austin Energy's Resource Generation Plan targets 100% carbon-free electricity by 2035, driving demand for solar GSU transformers, battery-storage step-up units (4-hour BESS at Hornsby Bend), and wind-corridor 345 kV grid reactors. Specifications follow IEEE C57.12.00 with Austin Energy ES-D-1410 pad-mount and ES-D-1411 substation standards, ester-fluid mandatory for downtown vault network and stainless-steel enclosures for flood resilience. Tender drivers: the Tesla Giga Texas (Austin Bolt) expansion, the Samsung Taylor semiconductor fab adjacency, Apple Campus 2 and the Austin-Bergstrom International Airport rebuild.

    Utility partners in Austin

    Austin Energy

    Other markets in United States

    Nearby cities we serve.

    Product catalogue

    Recommended products for Austin.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Austin

    For projects in Austin, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to Austin Energy specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.

    Operating elsewhere?

    See our markets in other regions.

    Procuring for Austin?

    Regionally compliant transformers and switchgear delivered to Austin with witnessed FAT and on-site commissioning.