United States
Transformers & Switchgear
in Charlotte.
ETS delivers IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Charlotte. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Charlotte is supplied by Duke Energy Carolinas at 12.47/24.9 kV MV with 100/230/525 kV transmission within the SERC Reliability region. Bulk supply: the Catawba (2,258 MW), McGuire (2,200 MW) and Oconee (2,538 MW) nuclear stations, plus the proposed Duke 6 GW offshore-wind landing at Wilmington. Specifications follow IEEE C57.12.00 with Duke's distribution standard SD-2000, copper windings, ester-fluid for downtown vault, IEEE 693 moderate seismic and IP55 enclosures for hurricane-season exposure. Tender drivers: Charlotte Douglas International Airport's terminal lobby expansion, the Bank of America Stadium / NFL Panthers training complex, the LYNX Blue Line Phase 2 light-rail extension and the Albemarle lithium-processing facility electrification.
Utility partners in Charlotte
Other markets in United States
Nearby cities we serve.
Product catalogue
Recommended products for Charlotte.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Charlotte
For projects in Charlotte, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to Duke Energy specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Charlotte?
Regionally compliant transformers and switchgear delivered to Charlotte with witnessed FAT and on-site commissioning.