United States
Transformers & Switchgear
in Newark.
ETS delivers IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Newark. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Newark is supplied by PSE&G (Public Service Electric & Gas) — New Jersey's incumbent utility — operating 4/13/26 kV at MV and 69/138/230 kV at transmission within PJM Interconnection. Bulk supply: the Salem and Hope Creek nuclear stations (3,800 MW combined), Linden CCGT and the proposed Atlantic Shores / Ocean Wind offshore farms (3+ GW landing at Sea Girt and Larrabee). Specifications follow IEEE C57.12.00 with PSE&G's TGE Standard 5101, ester-fluid for vault network, copper windings, IEEE 693 moderate seismic and IP55 enclosures for Hudson River salt-laden weather. Tender drivers: Port Newark Container Terminal expansion, Newark Liberty International Airport's Terminal A rebuild, the Newark biotech corridor and the proposed Gateway Hudson tunnel substation upgrades.
Utility partners in Newark
Other markets in United States
Nearby cities we serve.
Product catalogue
Recommended products for Newark.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Newark
For projects in Newark, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to PSE&G specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Newark?
Regionally compliant transformers and switchgear delivered to Newark with witnessed FAT and on-site commissioning.