United States

    Transformers & Switchgear
    in Newark.

    13:00 GMT-4·33°C · Clear

    ETS delivers IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Newark. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    US
    Country
    ANSI/IEEE C57
    Grid voltage
    Climate zone
    ANSI/IEEE C57
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Newark is supplied by PSE&G (Public Service Electric & Gas) — New Jersey's incumbent utility — operating 4/13/26 kV at MV and 69/138/230 kV at transmission within PJM Interconnection. Bulk supply: the Salem and Hope Creek nuclear stations (3,800 MW combined), Linden CCGT and the proposed Atlantic Shores / Ocean Wind offshore farms (3+ GW landing at Sea Girt and Larrabee). Specifications follow IEEE C57.12.00 with PSE&G's TGE Standard 5101, ester-fluid for vault network, copper windings, IEEE 693 moderate seismic and IP55 enclosures for Hudson River salt-laden weather. Tender drivers: Port Newark Container Terminal expansion, Newark Liberty International Airport's Terminal A rebuild, the Newark biotech corridor and the proposed Gateway Hudson tunnel substation upgrades.

    Other markets in United States

    Nearby cities we serve.

    Product catalogue

    Recommended products for Newark.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Newark

    Lead times for transformers and switchgear delivered to Newark depend on the specification, scope of supply, order volume and prevailing factory load — distribution transformers (11–33 kV, up to 5 MVA) typically build and test faster than power transformers (33 kV and above, up to 60 MVA), and every quoted programme includes witnessed Factory Acceptance Testing and agreed delivery terms. Please contact ETS with your technical schedule for a project-specific delivery plan.

    Operating elsewhere?

    See our markets in other regions.

    Procuring for Newark?

    Regionally compliant transformers and switchgear delivered to Newark with witnessed FAT and on-site commissioning.