ETS delivers BS EN 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Derby. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Derby is supplied by NGED (East Midlands licence) at 11/33 kV MV with 132 kV transmission. Bulk supply comes from the Ratcliffe-on-Soar decommissioning corridor. Specifications follow ENATS 35-1, ENATS 41-36 and BS EN 60076 with mandatory ester-fluid for indoor units, copper windings, low-noise envelopes for residential-adjacent substations and IP55 enclosures. Tender drivers: the Rolls-Royce Aerospace Sinfin / civil-aero / SMR (small-modular-reactor) campus, the Toyota Manufacturing UK Burnaston EV-line conversion, Bombardier Litchurch Lane train-build (Alstom), the East Midlands HS2 Hub at Toton (paused 2023) and the proposed Infinity Park aerospace cluster.
Utility partners in Derby
Other markets in England
Nearby cities we serve.
Product catalogue
Recommended products for Derby.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Derby
For projects in Derby, ETS quotes 14–18 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 20–26 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to National Grid ED specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?