Generator Step-Up (GSU) Transformers — view 1 of 1
    Power Plant to Grid
    200MVA
    Max Capacity
    132kV
    Voltage Class
    99.5%
    Efficiency
    40yr
    Design Life
    Power Plant to Grid · 10–200 MVA · Up to 132 kV

    Generator Step-Up (GSU) Transformers

    Generator step-up transformers purpose-built for power plants — connecting generators to the transmission grid at elevated voltage. Optimised for continuous full-load operation with low losses, high reliability, and enhanced short-circuit withstand.

    IEC 60076
    IEEE C57.12
    IEEE C57.116
    ISO 9001
    ISO 14001
    Capacity Range
    10 – 200 MVA
    Voltage Class
    Up to 132 kV
    Cooling
    ONAN / ONAF / OFAF
    Standards
    IEC 60076 / IEEE C57
    Tap Changer
    OLTC, ±10% in 17 steps
    Vector Group
    YNd1 / YNd11
    Type Tested
    Warranty
    Global

    Engineering Features

    Continuous Full-Load Rated

    Designed for 100% continuous duty at nameplate rating — no derating required for base-load generator operation.

    Technical Data

    ParameterRange / Value
    Rated Power10 – 200 MVA
    Voltage RatioUp to 132 kV / 6.6–22 kV
    Frequency50 / 60 Hz
    Vector GroupYNd1 / YNd11
    Impedance12% – 18%
    CoolingONAN / ONAF / OFAF
    Tap ChangerOLTC ±10% / 17 steps
    Temperature RiseTop oil ≤ 55K, Winding ≤ 60K
    StandardsIEC 60076 / IEEE C57.116
    Design Life40+ years

    Standard range parameters — custom specifications available on request.

    US Compliance & Trust Signals

    IEEE C57.12

    ANSI/IEEE distribution transformer standard

    ANSI C57.12.00

    General requirements liquid-immersed

    DOE 2016

    US Department of Energy efficiency rule

    NEMA TR1

    Sound level & loss tolerances

    UL Listed

    Underwriters Laboratories safety mark

    IEEE C57.110

    Harmonic-loaded transformer rating

    Regional Overview

    Generator step-up (GSU) transformers for North American power generation. 10 MVA to 500 MVA up to 765 kV — IEEE C57.12.00 designed, KEMA short-circuit certified and seismic-qualified. Trusted by Independent Power Producers, IOUs and NRECA G&T co-operatives for thermal CCGT plants, gigawatt-scale solar and wind, hydro upgrades and gas-peaker fleets across ERCOT, PJM, MISO, CAISO and SPP territories.

    Regional Reference Projects

    ERCOT IPP Wind & Solar GSU · West Texas

    PJM CCGT Power Plant GSU · Mid-Atlantic

    MISO Wind-Farm Step-Up · Iowa, Minnesota, Dakotas

    CAISO Solar GSU · Mojave & Imperial Valley

    TVA Hydro Upgrade GSU · Tennessee Valley

    Bonneville Power Hydro Step-Up · Pacific Northwest

    Applications

    Where Generator Step-Up (GSU) Transformers Excel.

    01
    01

    Gas Turbine Power Plants

    Step-up duty for simple-cycle and combined-cycle gas turbine generation.

    02
    02

    Steam Turbine Generation

    Coal, biomass, and nuclear steam-turbine generator interconnection.

    03
    03

    Combined Cycle Plants

    Optimised for CCGT auxiliaries and main generator step-up duty.

    04
    04

    Co-Generation Facilities

    Industrial CHP plants exporting surplus power to the utility grid.

    FAQ

    Frequently Asked Questions

    Related Knowledge

    FAQs, glossary terms and sizing steps mapped to this product.

    Ready to Specify Generator Step-Up Transformers?

    Share your technical requirements and our engineering team will provide a detailed proposal with guaranteed performance parameters.