    ETS manufactures NOM-002-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-center projects across Guadalajara. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    MX
    Country
    NMX-J-116-ANCE
    Grid voltage
    Climate zone
    NMX-J-116-ANCE
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Guadalajara is supplied by CFE Occidente at 13.8/23 kV MV with 115/230/400 kV transmission within the SEN. Bulk supply: the Manzanillo CCGT complex (1,900 MW), the Aguamilpa hydro (960 MW) and the proposed Pacific Coast LNG-to-power conversion. Specifications follow CFE NRF-048-CFE with high-altitude derating (≥1,500 m, Atemajac Valley), copper windings, IEEE 693 moderate seismic (Trans-Mexican Volcanic Belt) and IP55 for monsoon-season exposure. Tender drivers: the 'Mexican Silicon Valley' electronics cluster (Intel, Oracle, IBM, Flex), the Jalisco automotive nearshoring belt (Honda, Continental, Bosch), the Guadalajara International Airport (GDL) Terminal 2 build and the proposed Macrolibramiento ring-road industrial parks.

    Other markets in Mexico

    Nearby cities we serve.

    Product catalogue

    Recommended products for Guadalajara.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Guadalajara

    Lead times for transformers and switchgear delivered to Guadalajara depend on the specification, scope of supply, order volume and prevailing factory load — distribution transformers (11–33 kV, up to 5 MVA) typically build and test faster than power transformers (33 kV and above, up to 60 MVA), and every quoted programme includes witnessed Factory Acceptance Testing and agreed delivery terms. Please contact ETS with your technical schedule for a project-specific delivery plan.