Pakistan

    Transformers & Switchgear
    in Islamabad.

    22:12 GMT+5·25°C · Partly cloudy

    ETS delivers IEC 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-center projects across Islamabad. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    PK
    Country
    IEC 60076
    Grid voltage
    Climate zone
    IEC 60076
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Islamabad is Pakistan's federal capital, supplied by IESCO (Islamabad Electric Supply Company) at 11/33 kV MV with NTDC operating the 132/220/500 kV transmission backbone. Bulk supply comes from the Tarbela (4,888 MW) and Mangla (1,150 MW) hydro stations, plus the Neelum-Jhelum (969 MW) and the proposed Diamer-Bhasha (4,500 MW) projects. Specifications follow PSQCA-marked IEC 60076 with the Pothohar Plateau elevation derating (≥500 m), 40 °C tropicalised design and copper windings. Tender drivers: the Islamabad-Rawalpindi Metro expansion, the New Islamabad International Airport second runway, the CPEC Western Route corridor and the Murree-Islamabad-Lahore motorway substations.

    Other markets in Pakistan

    Nearby cities we serve.

    Product catalogue

    Recommended products for Islamabad.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Islamabad

    Lead times for transformers and switchgear delivered to Islamabad depend on the specification, scope of supply, order volume and prevailing factory load — distribution transformers (11–33 kV, up to 5 MVA) typically build and test faster than power transformers (33 kV and above, up to 60 MVA), and every quoted programme includes witnessed Factory Acceptance Testing and agreed delivery terms. Please contact ETS with your technical schedule for a project-specific delivery plan.

    Operating elsewhere?

    See our markets in other regions.

    Procuring for Islamabad?

    Regionally compliant transformers and switchgear delivered to Islamabad with witnessed FAT and on-site commissioning.