
BESS Transformers
Purpose-built for battery energy storage systems — bidirectional power flow, cyclic overload capability, and harmonic tolerance for grid-scale BESS applications.
Engineering Features
Bidirectional Power Flow
Designed for charge/discharge cycling with optimized winding configuration for reverse power flow.
Technical Data
| Parameter | Range / Value |
|---|---|
| Rated Power | 1 – 300 MVA |
| Primary Voltage | 11 – 132 kV |
| Secondary Voltage | 400 V – 36 kV |
| Frequency | 50 / 60 Hz |
| Power Flow | Bidirectional |
| Cycle Rating | 5,000+ cycles/year |
| K-Factor | K13 – K20 |
| Ambient Temp | -20°C to +55°C |
| Insulation Fluid | Mineral / FR3 / Midel |
| Design Life | 30+ years |
Standard range parameters — custom specifications available on request.
Related glossary terms
IEEE C57.12
ANSI/IEEE distribution transformer standard
ANSI C57.12.00
General requirements liquid-immersed
DOE 2016
US Department of Energy efficiency rule
NEMA TR1
Sound level & loss tolerances
UL Listed
Underwriters Laboratories safety mark
IEEE C57.110
Harmonic-loaded transformer rating
Bidirectional, harmonic-tolerant step-up transformers for the US grid-scale Battery Energy Storage System market. 1 MVA to 300 MVA up to 230 kV — IEEE C57.159 designed for cyclic bidirectional load, grid-forming-inverter harmonic content and high-temperature service. Supplied for ERCOT (Texas), CAISO (California), PJM, MISO and SPP standalone BESS, solar + BESS hybrids and grid-services projects.
ERCOT BESS · West Texas Standalone & Hybrid
CAISO BESS · California Imperial & Mojave
PJM BESS · Mid-Atlantic Capacity Market
Hyperscale Data-Centre On-Site BESS
Solar + BESS Hybrid Hubs · Arizona, Nevada
MISO & SPP Grid-Services BESS
Where BESS Transformers Excel.
California Self-Generation BESS
IEEE C57.159 BESS transformers for California utility-scale storage under SGIP, RA and resource adequacy programmes.
ERCOT Battery Storage
Bidirectional BESS transformers for fast-growing ERCOT battery storage market in Texas (5+ GW pipeline).
US Solar + Storage Hybrids
Converter-duty BESS transformers for ITC-eligible co-located solar-and-storage projects across the US.
Northeast & PJM Capacity BESS
BESS transformers for PJM, NYISO and ISO-NE capacity-market and grid-services battery storage projects.
Frequently Asked Questions
Related Knowledge
FAQs, glossary terms and sizing steps mapped to this product.

Ready to Specify BESS Transformers?
Share your technical requirements and our engineering team will provide a detailed proposal with guaranteed performance parameters.



