Jordan

    Transformers & Switchgear
    in Aqaba.

    12:21 GMT+3·35°C · Partly cloudy

    ETS delivers IEC 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Aqaba. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    JO
    Country
    IEC 60076
    Grid voltage
    Climate zone
    IEC 60076
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Aqaba is Jordan's only seaport and a Special Economic Zone (ASEZA) with its own utility licence under EDCO/IDECO frameworks, plus dedicated bulk supply from the Aqaba Thermal Power Plant (650 MW) and the proposed Aqaba-Amman 400 kV transmission upgrade. Voltage families: 11/33 kV at MV and 132 kV at transmission. The Red Sea coastal salt-fog, 45 °C summer ambient and the cruise/container port load drive a tropicalised IEC 60076 spec with C5-M paint and copper windings. Tender drivers: the Aqaba Container Terminal expansion, the Aqaba-Eilat-Akko hydrogen export pipeline study and the proposed Saudi-Jordan 3 GW HVDC interconnector landing.

    Utility partners in Aqaba

    EDCO

    Other markets in Jordan

    Nearby cities we serve.

    Product catalogue

    Recommended products for Aqaba.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Aqaba

    For projects in Aqaba, ETS quotes 8–14 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 16–22 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to EDCO specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.

    Operating elsewhere?

    See our markets in other regions.

    Procuring for Aqaba?

    Regionally compliant transformers and switchgear delivered to Aqaba with witnessed FAT and on-site commissioning.