BESS Transformers — view 1 of 3
    Battery Storage
    300MVA
    Max Capacity
    132kV
    Voltage Class
    99.4%
    Efficiency
    30yr
    Design Life
    Battery Storage · Bidirectional · Cyclic

    BESS Transformers

    Purpose-built for battery energy storage systems — bidirectional power flow, cyclic overload capability, and harmonic tolerance for grid-scale BESS applications.

    ENATS 35-1
    EU EcoDesign Tier 2
    IEC 60076
    IEEE C57
    IEEE C57.159
    ISO 9001
    ISO 14001
    Capacity Range
    1 MVA – 300 MVA
    Voltage Class
    Up to 132 kV
    Cooling
    ONAN / KNAN / ONAF / KNAF
    Standards
    IEC 60076 / IEEE C57
    Power Flow
    Bidirectional
    Insulation
    Mineral Oil / FR3 / Midel
    Type Tested
    Warranty
    Global

    Engineering Features

    Bidirectional Power Flow

    Designed for charge/discharge cycling with optimized winding configuration for reverse power flow.

    Technical Data

    ParameterRange / Value
    Rated Power1 – 300 MVA
    Primary Voltage11 – 132 kV
    Secondary Voltage400 V – 36 kV
    Frequency50 / 60 Hz
    Power FlowBidirectional
    Cycle Rating5,000+ cycles/year
    K-FactorK13 – K20
    Ambient Temp-20°C to +55°C
    Insulation FluidMineral / FR3 / Midel
    Design Life30+ years

    Standard range parameters — custom specifications available on request.

    UK Compliance & Trust Signals

    ENATS 35-1

    DNO-approved distribution transformer specification

    ENATS 35-2

    UK secondary substation transformer standard

    G99 Compliant

    Engineering Recommendation G99 grid interface

    BS EN 60076

    British Standard for power transformers

    KEMA Certified

    Independent short-circuit witness testing

    EcoDesign Tier 2

    EU 548/2014 efficiency compliance

    Regional Overview

    Bidirectional, harmonic-tolerant step-up transformers purpose-built for UK Battery Energy Storage System (BESS) sites. 1 MVA to 100 MVA up to 132 kV — G99 grid-code compliant, designed for cyclic full-load operation in both directions and tolerant of harmonic content from grid-forming inverters. Supplied for stand-alone BESS, co-located solar + BESS and grid-services projects across the UK.

    Regional Reference Projects

    UK Standalone BESS · 100–500 MWh Sites

    Co-located Solar + BESS · England & Wales

    Grid-Services BESS · Frequency Response, FFR, DC

    Capacity Market BESS · UK Auctions

    Onshore Wind + BESS Hybrids · Scotland

    Distribution-Connected BESS · UKPN, NIE, SP Energy

    Applications

    Where BESS Transformers Excel.

    01
    01

    UK Grid-Scale BESS

    G99-compliant BESS transformers for UK grid-scale battery storage projects across England, Scotland and Wales.

    02
    02

    UK Capacity Market BESS

    Bidirectional BESS transformers for UK Capacity Market, T-1 and T-4 auction projects providing peak capacity.

    03
    03

    UK Co-located Solar + Storage

    ENATS-compliant transformers for UK co-located solar and BESS projects on shared DNO connections.

    04
    04

    UK Frequency Response BESS

    BESS transformers for UK Dynamic Containment, Dynamic Moderation and Dynamic Regulation frequency-response projects.

    FAQ

    Frequently Asked Questions

    Related Knowledge

    FAQs, glossary terms and sizing steps mapped to this product.

    Ready to Specify BESS Transformers?

    Share your technical requirements and our engineering team will provide a detailed proposal with guaranteed performance parameters.