England
Transformers & Switchgear
in Swindon.
ETS manufactures BS EN 60076-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Swindon. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Swindon is supplied by SSEN (Southern Electric Power Distribution licence) at 11/33 kV MV with 132 kV transmission. Bulk supply comes from the Didcot supergrid junction and the proposed Western HVDC Link reinforcement. Specifications follow ENATS 35-1, ENATS 41-36 and BS EN 60076 with mandatory ester-fluid for indoor units, copper windings, low-noise envelopes for residential-adjacent substations and IP55 enclosures. Tender drivers: the Honda UK Manufacturing Swindon (closed 2021, redeveloping as logistics + Panattoni Park), the Innovation Campus / Science Museum Group Wroughton, the proposed Swindon-Cricklade rail reinstatement and the M4 corridor data-centre cluster.
Other markets in England
Nearby cities we serve.
Product catalogue
Recommended products for Swindon.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Swindon
Lead times for transformers and switchgear delivered to Swindon depend on the specification, scope of supply, order volume and prevailing factory load — distribution transformers (11–33 kV, up to 5 MVA) typically build and test faster than power transformers (33 kV and above, up to 60 MVA), and every quoted programme includes witnessed Factory Acceptance Testing and agreed delivery terms. Please contact ETS with your technical schedule for a project-specific delivery plan.
Operating elsewhere?
See our markets in other regions.
Procuring for Swindon?
Regionally compliant transformers and switchgear delivered to Swindon with witnessed FAT and on-site commissioning.