United States
Transformers & Switchgear
in Los Angeles.
ETS manufactures IEEE C57-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Los Angeles. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Los Angeles is co-served by LADWP (Los Angeles Department of Water and Power, the largest US municipal utility) and SCE (Southern California Edison) on a mixed 4.8/16/34.5 kV MV grid stepped down from 138/230/500 kV transmission. The legacy 4.8 kV underground network in the downtown core is being phased out under LADWP's 'Power System Reliability Program', creating sustained demand for vault-replacement transformers and pad-mounted distribution units. Other procurement drivers include LADWP's LA100 study (100% renewables by 2035), the SCE wildfire-mitigation programme (covered conductors and grid-hardening transformers), and the LAX terminal expansion. Specifications follow IEEE C57.12.00 / C57.12.34, with LADWP's MS-MS-300 mandating seismic Zone 4 anchorage (IEEE 693 Moderate-level qualification), wildfire-zone bushing requirements and natural-ester dielectric for vault units. Tender hints: LADWP and SCE both run multi-year framework agreements; type-test certification from short-circuit-witnessed labs is mandatory.
Other markets in United States
Nearby cities we serve.
Product catalogue
Recommended products for Los Angeles.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Los Angeles
Lead times for transformers and switchgear delivered to Los Angeles depend on the specification, scope of supply, order volume and prevailing factory load — distribution transformers (11–33 kV, up to 5 MVA) typically build and test faster than power transformers (33 kV and above, up to 60 MVA), and every quoted programme includes witnessed Factory Acceptance Testing and agreed delivery terms. Please contact ETS with your technical schedule for a project-specific delivery plan.
Operating elsewhere?
See our markets in other regions.
Procuring for Los Angeles?
Regionally compliant transformers and switchgear delivered to Los Angeles with witnessed FAT and on-site commissioning.



