    ETS delivers NOM-002-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Guadalajara. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.

    MX
    Country
    NMX-J-116-ANCE
    Grid voltage
    Climate zone
    NMX-J-116-ANCE
    Standards

    Market context

    Local grid, utilities, climate and procurement.

    Guadalajara is supplied by CFE Occidente at 13.8/23 kV MV with 115/230/400 kV transmission within the SEN. Bulk supply: the Manzanillo CCGT complex (1,900 MW), the Aguamilpa hydro (960 MW) and the proposed Pacific Coast LNG-to-power conversion. Specifications follow CFE NRF-048-CFE with high-altitude derating (≥1,500 m, Atemajac Valley), copper windings, IEEE 693 moderate seismic (Trans-Mexican Volcanic Belt) and IP55 for monsoon-season exposure. Tender drivers: the 'Mexican Silicon Valley' electronics cluster (Intel, Oracle, IBM, Flex), the Jalisco automotive nearshoring belt (Honda, Continental, Bosch), the Guadalajara International Airport (GDL) Terminal 2 build and the proposed Macrolibramiento ring-road industrial parks.

    Utility partners in Guadalajara

    CFE

    Other markets in Mexico

    Nearby cities we serve.

    Product catalogue

    Recommended products for Guadalajara.

    A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.

    FAQ

    Frequently Asked Questions — Guadalajara

    For projects in Guadalajara, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to CFE specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.

    Operating elsewhere?

    See our markets in other regions.

    Procuring for Guadalajara?

    Regionally compliant transformers and switchgear delivered to Guadalajara with witnessed FAT and on-site commissioning.