Canada
Transformers & Switchgear
in Montreal.
ETS delivers CSA C88-compliant power transformers, distribution transformers, switchgear and package substations to utilities, EPC contractors, oil & gas operators, renewable developers and data-centre projects across Montreal. Triple-certified manufacturing (IEC, ANSI/IEEE, UL) supports utility-grade procurement with witnessed FAT, ISO/IEC 17025 testing and turnkey delivery.
Market context
Local grid, utilities, climate and procurement.
Montreal is supplied entirely by Hydro-Québec — the largest electric utility in Canada and the world's largest hydroelectric producer (37 GW installed). The grid runs 12/25 kV at MV and 120/315/735 kV at transmission, with the iconic 735 kV ultra-high-voltage backbone (the world's first) carrying La Grande and Manicouagan hydro to load centres. Hydro-Québec's network is asynchronous to the Eastern Interconnection — connections to New York, New England, Ontario and the Maritimes run through HVDC back-to-back converters (Châteauguay, Madawaska, Outaouais, future Twin States Link). Specifications follow CSA C88 / Hydro-Québec norm SN-29.1 with mandatory copper windings, ester-fluid for indoor units, −40 °C cold-start rating and IEEE 693 high-seismic qualification (Charlevoix-Kamouraska fault). Procurement is shaped by the REM (Réseau express métropolitain) light-metro expansion, Montréal-Trudeau Airport upgrades, the Port of Montréal Contrecoeur container terminal and the Bécancour green-hydrogen / battery-cell cluster. Tender hints: Hydro-Québec demands SAP Ariba registration and IFR (International Financial Reporting) compliance from foreign suppliers.
Utility partners in Montreal
Other markets in Canada
Nearby cities we serve.
Product catalogue
Recommended products for Montreal.
A curated portfolio of transformers and switchgear matched to local utility specifications, standards and project drivers.
Frequently Asked Questions — Montreal
For projects in Montreal, ETS quotes 16–20 weeks for distribution transformers (11–33 kV, up to 5 MVA) and 22–28 weeks for power transformers (33 kV and above, up to 60 MVA), inclusive of witnessed Factory Acceptance Testing to Hydro-Québec specifications and ex-works delivery. Express slots are sometimes available for repeat customers — confirm at quote stage.
Operating elsewhere?
See our markets in other regions.
Procuring for Montreal?
Regionally compliant transformers and switchgear delivered to Montreal with witnessed FAT and on-site commissioning.